Consultation period begins

The consultation leaflets have started to be delivered

The main difference to the plan is to have two lanes and a bus lane, which will mean road widening and the narrowing of paths.

There is a questionnaire, to be returned before 25th September 2009

There is to be a public display in the Ridings on the 4th/5th September 2009 (Upper mall, outside boots)

A second display will be at Newton bar, Lower building car park on Saturday 12th September 2009.

The website is www.northwakefieldgateway.com

I have included new copies of the plan here

Leave a Reply